Transition to Automated Urethane Dispensing

We connected with this company to help improve their production performance, and the impact was immediate. The team was thrilled with the results, seeing smoother operations, less waste, and far fewer defects. With improved efficiency, lower maintenance needs, and reduced operating costs, the changes made a meaningful difference to their day-to-day work and overall bottom line.

  • Increased Equipment Uptime

  • Reduced Material Waste

  • Greatly Reduced Production Defects

  • Substantial Savings to Total Cost of Operations

%

Increase in Equipment Uptime

Before Implementation: 75%
After Implementation: 98%

%

Reduction in Material Waste

Before Implementation: 15%
After Implementation: 2%

%

Production Defect Rate

Before Implementation: 8%
After Implementation: 1%

Lower Energy Consumtion Cost

Significantly Lower Maintenance Cost

Substantial Savings

The reduction in material waste and maintenance costs, combined with increased production capacity, led to a projected Return on Investment of 25% within the first year of operation.